🏠 Home Opinion Pieces
🏠

Opinions22-06-2026Gulf Keystone ready to resume oil production at Sheikhan fieldThe London-listed Gulf Keystone Petroleum (GKP) has reported that, despite the temporary suspension of production at the Sheikhan field north of Erbil and a 50 percent reduction in expenditures, it remains fully prepared for a rapid resumption of oil exports. This comes amid a new diplomatic horizon following the signing of a framework agreement between the US and Iran.

Rudaw 2026/06/22 09:28

Opinions22-06-2026Gulf Keystone ready to resume oil production at Sheikhan fieldThe London-listed Gulf Keystone Petroleum (GKP) has reported that, despite the temporary suspension of production at the Sheikhan field north of Erbil and a 50 percent reduction in expenditures, it remains fully prepared for a rapid resumption of oil exports. This comes amid a new diplomatic horizon following the signing of a framework agreement between the US and Iran.

Read full story at source (Rudaw)